avatar

e.g: Raul ochoa

Score
100%
Experience:
20 y
Score
100%
Experience:
20 y
Location:
6201 Maturin
Last update:
21.04.2021
Register to Contact Freelancer
Available
Onsite hourly: N/A
Remote hourly: N/A
Spanish: Native
English: Basic knowledge
* Joining teams in public or private entities to provide a comprehensive professional service excellence, demonstrating my knowledge, skills and abilities in the assigned area * propose new goals that are within reach * be available to cover any activity that is required by the company * proactive *
SKILLS
*First day of research (Rapporteur).Duration: 16 hours (2003)
* Basic course of Lulo Win. Duration: 01 month (2003)
* Advanced Engineering. Duration: 08 hours (2002)
* Conference qualified for the environment. Duration: 16 hours (2000)
* Forum on economic globalization and new management trends: challenges and opportunities for Venezuela. Duration: 06 hour (2000)
* Earth retention system. Duration: 12 hours (2000)
* First day of research (Rapporteur).
* Windows 10 (Word, Excel, Power Point)
* Microsoft Internet Explore
* Lulocron
* AutoCAD 2016, Auto cap Land, Archicad 6.0, Cypecad 99,
* Autopipe 6.0
* Flowmaster
* CMDB, Cybernet, H channels
* Merfalaboratorio, SAFE, SAP 2000, STAAP III V220, HEC
* Spring, WPD, Dodson Hydrocalc, EPA Models
* Fluids, hydraulics, Prokon
* IP 3, 6.0 SMADA
* Saint administrative Software
* Inspection
* metric computation
* personnel management
* projects drawing
* handling of trials of concrete and soil
* calculation of concrete
* works management
* data Control: labor, equipment, materials
* processes: analysis of unit prices, valuations, review of prices, increase and decrease, works extra. * Planning of work
Windows AutoCAD Word Excel SAP CMDB Archicad Windows 10 Power Point
15.08.2017 — Now
Industries METAL Mechanics MÉRIDA C.A.
Manager: Engineer Planner
Work: "Construction of Perimeter Fence of the Industrial Safety Building, El Tejero- Ezequiel Zamora Municipality, Monagas State. PDVSA", VENEZUELA
15.11.2016 — 30.06.2017
HELENA RESIDENCE; AGMA INVESTMENT of VENEZUELA C.A.; city Tiuna
Manager: Resident engineer
Work: "Remodeling and Adaptation of Recreation and Sports Areas in Residences Helena Los Naranjos, Caracas, Distrito Capital- Residencia Helena Condominium" VENEZUELA Company: AGMA INVESTMENT of VENEZUELA C.A., Caracas, Dto. Capital From: 6 January 2016-30 June 2016 Manager: Resident engineer Work: "Culmination of buildings residential (38 and 39) type 2 on the Manz.6 in the complex urban city Tiuna, Caracas, Distrito Capital-CONSTRUFANB" VENEZUELA
15.01.2015 — 17.12.2015
Construction of 23 Town House urbanism strong Tiuna
Manager: Resident engineer
15.10.2014 — 15.01.2015
Manager: Resident engineer
Work: "Rehabilitation of the entrance to victory in the municipality José Félix Rivas of the Bolivarian State of Aragua (stage II toll victory)" Governor of ARAGUA State. VENEZUELA
15.05.2013 — 30.05.2014
INVESTMENT PETROCIV C.A
Manager: Cost analyst, designer, field engineer
Work: "Construction of condominium multiple 1314 homes, Anaco, Anzoátegui (Urb. Doña Josefita) - MINVIH". VENEZUELA
09.06.2011 — 15.05.2013
INVESMENT PETROCIV C.A
Manager: Cost analyst
Work: "Rehabilitation and patch all of the core, rehabilitation of the stretch Highway Jusepin, Prog 0 + 910 1 + 440, Estado Monagas - MPPTT". Venezuela
09.06.2011 — 15.05.2013
CONSTRUCTS HER-BROSS C.A
Manager: Cost analyst
Work: "Completion of the rehabilitation of the motorway stretch Jusepin, Prog from the 0 + 000 to 1 + 961.03, been Monagas-MPPTT". VENEZUELA
09.06.2011 — 15.05.2013
Manager: Cost analyst, field engineer
Work: "Adequacy of urbanism and construction of facultative lagoons at Polo endogenous, located in the sector State Amarilis Monagas-INAVI". VENEZUELA
09.06.2011 — 15.05.2013
Manager: Resident engineer
Work: "LO09 rehabilitation with joint TO15 - stretch San Diego de Cabrutica-Mapire, stage I, progressive from 51 + 000 to the 108 + 093, been Anzoategui - MPPTT". VENEZUELA
09.06.2011 — 15.05.2013
Manager: Cost analyst
Work: "Continuation of the rehabilitation of the motorway stretch Jusepin, Prog." "since the 0 + 000 to 1 + 961.03, Monagas state - MPPTT". Venezuela
09.06.2011 — 15.05.2013
Lara and Zulia - MPPTT". VENEZUELA
Manager: Cost analyst. Field engineer
OBR a: "Rehabilitation of the LO17, section Lara-Zulia, I stage, progressive 59 + 000 to the 65 + 000 (rehabilitation of the bridge Sicare and replacement of culverts), and forward 80 + 000 to 80 + 400 (retaining wall construction), Lara and Zulia - MPPTT". VENEZUELA
09.06.2011 — 15.05.2013
Manager
Manager: Cost analyst, designer, procurement, field Eng.. Work: "Construction of 100 housing units and culmination of 258 housing units in the urban pole of endogenous development located in the sector State Amarilis Monagas - INAVI".VENEZUELA
01.11.2010 — 09.06.2011
ARCHITEC C.A.
Manager: Resident engineer
Work: "Construction of bases of lighting and communication in the complex field fifteen, Quiriquire, Edo Monagas"-PDVSA. VENEZUELA
01.11.2009 — 31.07.2010
KAYSON COMPANY
Manager: Supervisor of operations
Work: "Construction of 10000 units of urban complex housing the great victory Maturin".Edo Monagas * GMVV. VENEZUELA
01.09.2008 — 28.02.2009
GOLDEN HOUSE.
Manager: Engineer Adviser
Work: " 2 type housing construction Town House GOLDEN HOUSE ", Maturín - Estado Monagas '. My home Bank. VENEZUELA
01.03.2007 — 30.09.2009
G & P BUILDERS S.A.
Manager: Resident engineer
Work: "Construction of works of urbanism and 696 dwellings in urbanization Jardines de San Jaime, Maturín, Monagas municipality Maturín State"-Banesco Bank and Bank Mercantil. VENEZUELA
01.08.2006 — 31.12.2006
VANCI CARRERO
Manager: Engineer Inspector
Work: "Center of diagnosis Integral without surgical Mopia III - INAVI" Sta. Teresa de el Tuy, Edo. Miranda. VENEZUELA "Center of Integral diagnosis without surgery Parosca - INAVI" Ocumare del Tuy, Edo.Miranda. Venezuela
01.04.2006 — 31.12.2006
MUTUAL TRADING of VENEZUELA. C.A
Manager: Field engineer
Work: "Running 03 structure buildings of 4 floors of the complex urban city Miranda - FONDUR concrete" - Charallave - Edo. Miranda. VENEZUELA
01.09.2005 — 31.01.2007
CONSTRUCTORA PEWEL
Manager: Resident engineer
Work: "Execution of buildings structures 05 metal on the complex housing city Miranda - FONDUR"-Charallave. Edo. Miranda VENEZUELA
01.04.2005 — 31.08.2006
Manager: Inspection Assistant
Work: 'Culmination of 3 buildings; (2) type (1) and 4 type 13 of metallic structure in the city Miranda-FONDUR residential complex "Charallave. Edo. Miranda. VENEZUELA "Construction of 56 houses type 6 in the complex housing city Miranda - FONDUR" Charallave, Edo. Miranda. Venezuela
01.01.2005 — 28.02.2005
TROGAR, AC INVERSORA
Manager: Draughtsman
01.02.2002 — 28.02.2003
I.U.P. "SANTIAGO MARIÑO"; ROADS AND BUILDINGS, CA. (CAYCO)
Manager: Soils and materials laboratory teacher tutor
20.08.2000 — 12.10.2000
ZEITLICHE UND RÄUMLICHE VERFÜGBARKEIT
Manager: Dept. of engineering / intern
ZEITLICHE UND RÄUMLICHE VERFÜGBARKEIT * Joining teams in public or private entities to provide a comprehensive professional service excellence, demonstrating my knowledge, skills and abilities in the assigned area * propose new goals that are within reach * be available to cover any activity that is required by the company * proactive * immediate availability * willing to reside me where it warrants

Description

SKILLS
*First day of research (Rapporteur).Duration: 16 hours (2003)
* Basic course of Lulo Win. Duration: 01 month (2003)
* Advanced Engineering. Duration: 08 hours (2002)
* Conference qualified for the environment. Duration: 16 hours (2000)
* Forum on economic globalization and new management trends: challenges and opportunities for Venezuela. Duration: 06 hour (2000)
* Earth retention system. Duration: 12 hours (2000)
* First day of research (Rapporteur).
* Windows 10 (Word, Excel, Power Point)
* Microsoft Internet Explore
* Lulocron
* AutoCAD 2016, Auto cap Land, Archicad 6.0, Cypecad 99,
* Autopipe 6.0
* Flowmaster
* CMDB, Cybernet, H channels
* Merfalaboratorio, SAFE, SAP 2000, STAAP III V220, HEC
* Spring, WPD, Dodson Hydrocalc, EPA Models
* Fluids, hydraulics, Prokon
* IP 3, 6.0 SMADA
* Saint administrative Software
* Inspection
* metric computation
* personnel management
* projects drawing
* handling of trials of concrete and soil
* calculation of concrete
* works management
* data Control: labor, equipment, materials
* processes: analysis of unit prices, valuations, review of prices, increase and decrease, works extra. * Planning of work

Main Skills

Other Skills

Windows AutoCAD Word Excel SAP CMDB Archicad Windows 10 Power Point

Work & Experience

15.08.2017 — Now
Industries METAL Mechanics MÉRIDA C.A.
Manager: Engineer Planner
Work: "Construction of Perimeter Fence of the Industrial Safety Building, El Tejero- Ezequiel Zamora Municipality, Monagas State. PDVSA", VENEZUELA
15.11.2016 — 30.06.2017
HELENA RESIDENCE; AGMA INVESTMENT of VENEZUELA C.A.; city Tiuna
Manager: Resident engineer
Work: "Remodeling and Adaptation of Recreation and Sports Areas in Residences Helena Los Naranjos, Caracas, Distrito Capital- Residencia Helena Condominium" VENEZUELA Company: AGMA INVESTMENT of VENEZUELA C.A., Caracas, Dto. Capital From: 6 January 2016-30 June 2016 Manager: Resident engineer Work: "Culmination of buildings residential (38 and 39) type 2 on the Manz.6 in the complex urban city Tiuna, Caracas, Distrito Capital-CONSTRUFANB" VENEZUELA
15.01.2015 — 17.12.2015
Construction of 23 Town House urbanism strong Tiuna
Manager: Resident engineer
15.10.2014 — 15.01.2015
Manager: Resident engineer
Work: "Rehabilitation of the entrance to victory in the municipality José Félix Rivas of the Bolivarian State of Aragua (stage II toll victory)" Governor of ARAGUA State. VENEZUELA
15.05.2013 — 30.05.2014
INVESTMENT PETROCIV C.A
Manager: Cost analyst, designer, field engineer
Work: "Construction of condominium multiple 1314 homes, Anaco, Anzoátegui (Urb. Doña Josefita) - MINVIH". VENEZUELA
09.06.2011 — 15.05.2013
INVESMENT PETROCIV C.A
Manager: Cost analyst
Work: "Rehabilitation and patch all of the core, rehabilitation of the stretch Highway Jusepin, Prog 0 + 910 1 + 440, Estado Monagas - MPPTT". Venezuela
09.06.2011 — 15.05.2013
CONSTRUCTS HER-BROSS C.A
Manager: Cost analyst
Work: "Completion of the rehabilitation of the motorway stretch Jusepin, Prog from the 0 + 000 to 1 + 961.03, been Monagas-MPPTT". VENEZUELA
09.06.2011 — 15.05.2013
Manager: Cost analyst, field engineer
Work: "Adequacy of urbanism and construction of facultative lagoons at Polo endogenous, located in the sector State Amarilis Monagas-INAVI". VENEZUELA
09.06.2011 — 15.05.2013
Manager: Resident engineer
Work: "LO09 rehabilitation with joint TO15 - stretch San Diego de Cabrutica-Mapire, stage I, progressive from 51 + 000 to the 108 + 093, been Anzoategui - MPPTT". VENEZUELA
09.06.2011 — 15.05.2013
Manager: Cost analyst
Work: "Continuation of the rehabilitation of the motorway stretch Jusepin, Prog." "since the 0 + 000 to 1 + 961.03, Monagas state - MPPTT". Venezuela
09.06.2011 — 15.05.2013
Lara and Zulia - MPPTT". VENEZUELA
Manager: Cost analyst. Field engineer
OBR a: "Rehabilitation of the LO17, section Lara-Zulia, I stage, progressive 59 + 000 to the 65 + 000 (rehabilitation of the bridge Sicare and replacement of culverts), and forward 80 + 000 to 80 + 400 (retaining wall construction), Lara and Zulia - MPPTT". VENEZUELA
09.06.2011 — 15.05.2013
Manager
Manager: Cost analyst, designer, procurement, field Eng.. Work: "Construction of 100 housing units and culmination of 258 housing units in the urban pole of endogenous development located in the sector State Amarilis Monagas - INAVI".VENEZUELA
01.11.2010 — 09.06.2011
ARCHITEC C.A.
Manager: Resident engineer
Work: "Construction of bases of lighting and communication in the complex field fifteen, Quiriquire, Edo Monagas"-PDVSA. VENEZUELA
01.11.2009 — 31.07.2010
KAYSON COMPANY
Manager: Supervisor of operations
Work: "Construction of 10000 units of urban complex housing the great victory Maturin".Edo Monagas * GMVV. VENEZUELA
01.09.2008 — 28.02.2009
GOLDEN HOUSE.
Manager: Engineer Adviser
Work: " 2 type housing construction Town House GOLDEN HOUSE ", Maturín - Estado Monagas '. My home Bank. VENEZUELA
01.03.2007 — 30.09.2009
G & P BUILDERS S.A.
Manager: Resident engineer
Work: "Construction of works of urbanism and 696 dwellings in urbanization Jardines de San Jaime, Maturín, Monagas municipality Maturín State"-Banesco Bank and Bank Mercantil. VENEZUELA
01.08.2006 — 31.12.2006
VANCI CARRERO
Manager: Engineer Inspector
Work: "Center of diagnosis Integral without surgical Mopia III - INAVI" Sta. Teresa de el Tuy, Edo. Miranda. VENEZUELA "Center of Integral diagnosis without surgery Parosca - INAVI" Ocumare del Tuy, Edo.Miranda. Venezuela
01.04.2006 — 31.12.2006
MUTUAL TRADING of VENEZUELA. C.A
Manager: Field engineer
Work: "Running 03 structure buildings of 4 floors of the complex urban city Miranda - FONDUR concrete" - Charallave - Edo. Miranda. VENEZUELA
01.09.2005 — 31.01.2007
CONSTRUCTORA PEWEL
Manager: Resident engineer
Work: "Execution of buildings structures 05 metal on the complex housing city Miranda - FONDUR"-Charallave. Edo. Miranda VENEZUELA
01.04.2005 — 31.08.2006
Manager: Inspection Assistant
Work: 'Culmination of 3 buildings; (2) type (1) and 4 type 13 of metallic structure in the city Miranda-FONDUR residential complex "Charallave. Edo. Miranda. VENEZUELA "Construction of 56 houses type 6 in the complex housing city Miranda - FONDUR" Charallave, Edo. Miranda. Venezuela
01.01.2005 — 28.02.2005
TROGAR, AC INVERSORA
Manager: Draughtsman
01.02.2002 — 28.02.2003
I.U.P. "SANTIAGO MARIÑO"; ROADS AND BUILDINGS, CA. (CAYCO)
Manager: Soils and materials laboratory teacher tutor
20.08.2000 — 12.10.2000
ZEITLICHE UND RÄUMLICHE VERFÜGBARKEIT
Manager: Dept. of engineering / intern
ZEITLICHE UND RÄUMLICHE VERFÜGBARKEIT * Joining teams in public or private entities to provide a comprehensive professional service excellence, demonstrating my knowledge, skills and abilities in the assigned area * propose new goals that are within reach * be available to cover any activity that is required by the company * proactive * immediate availability * willing to reside me where it warrants

Attachments