avatar

MM/WM/EWM Consultant

Score
100%
Experience:
24 y
Score
100%
Experience:
24 y
Location:
Last update:
21.04.2021
Register to Contact Freelancer
Available
Onsite hourly: N/A
Remote hourly: N/A
English: Advanced
Polish: Native
Location: Wroclaw, Poland Flexible to travel in Europe
SKILLS
- good knowledge of MM (8 full cycles + 3 roll-outs + 4 upgrades + support)
- good knowledge of WM (5 full cycles + 2 roll-outs + 1 upgrade + support)
- EWM implementation – 1 project
- SD (basic configuration, main processes: 1 full cycle + 1 upgrade + support) - LE-TRA Transport (1 full cycle)
- Logistic Execution – selected functionalities as part of all projects

Bar codes:                           
Good knowledge of pallet identification (EAN/GS1 logistic pallet label), Odette shipping labels in automotive.
Five full implementations of bar codes printing and scanning (Zebra and Intermec printers; Symbol/Motorola/Zebra and Intermec RF terminals). Configuration of WebSAPConsole and ITS Mobile.
Several small support projects involving bar codes, Storage Units or HUM.

Data take over:                 
Good knowledge of LSMW and standard SAP’s programs; non-standard ABAP programs preparation (BAPI, batch-inputs)
EDI / IDOC / ALE:              
Good knowledge (4 full cycles + 1 roll-out) including blueprint, customizing, development and administration. This covers:
- orders, shipping notifications and invoices with customers
- orders and invoices with vendors
- interface with distribution centres/3PLs (several message types)
Basic knowledge of SAP Business Connector 4.6 and SAP PI/XI
ABAP programming:        
Good knowledge covering preparation of rep
ABAP BAPI MS Access SAPscript XML Digital signature Data conversion tablets SAP PI SQL optimization debugging SAP EWM Object oriented programming system configuration SAP R/3 ABAP programming Zebra software installation IDOC XML files SAP Data migration SAP Business Connector MS Visio
01.06.2016 — 31.07.2017
Boots
SAP EWM implementation for production plants (in UK and France). Cosmetics/pharmacy industry - extra requirements resulting from MHRA regulations. Integration of EWM with MM, SD, PP and QM. * Workshops with business owners and users, requirements gathering * Process flows preparation (MS Visio) * Detail design preparation * Technical specification preparation for RICEF objects * RFC, CIF and data replication setup between ERP and EWM systems * ERP and EWM system configuration (batch management, handling unit management, classification, inbound and outbound processes, integration with MM, SD, PP and QM) * Label printing configuration and development - SATO printers * ITSMobile configuration and RF screens modifications for hand-held terminals * Data upload and migration preparation in EWM (input file formats preparation, LSMW preparation, non-standard program preparation) * BAdi implementation, SMARTforms modifications * Cut-over plan preparation * Test scenarios and scripts preparation * Unit and system tests
01.12.2015 — 30.06.2016
ZCh Siarkopol
Designing and developing interface between SAP R/3 and B2B system based on XML files (master data replication, sales orders creation, orders confirmation sending). * Solution / flows preparation * XML file formats preparation * Interface program preparation in SAP system (full developments) * Technical documentation preparation
01.06.2015 — 31.05.2016
Volvo
Implementation of WM in a new warehouse area and building extensions for existing WM functionality. Bus manufacturing plant. * As-is analysis and documentation (existing solution) * Requirements gathering * Technical documentation preparation for RF transactions, ODETTE label printing, picking transactions (dedicated to mobile tablets) * Developments: RF transactions, label printing (SAPscripts), reports * System configuration * System tests with HP QC * End user training * Go-live preparation and data upload (material master data, storage bins) * Post go-live support
01.01.2014 — 31.12.2015
Sun Garden
WM implementation for a new warehouse in production plant. Enhancements preparation. * As-is analysis and documentation (old existing solution) * Workshops with business owners and users, requirements gathering * Gap analysis * Detail design preparation * Blue-print documents preparation * Functional specification preparation for RF transactions and enhancements * WM system configuration (storage unit management, inbound and outbound processes, integration with MM, SD and PP) * RF transactions development * Test scenarios and scripts preparation * Unit and system tests * Data upload preparation (preparation of input file formats, LSMW) * Go-live preparation and data upload (material master data, storage bins) * Post go-live support
01.01.2013 — Now
Valeo Service Polska
expert consultant
distribution company. * SAP project methodology presentation * Blue print and processes verification * GAP analysis * Verification of functional specifications (extensions - RF transactions, user exits)
01.01.2012 — 31.12.2015
Kraft Foods / Mondelez
Commercial area / Order To Cash (WM, SD, MM) support team lead for EMEA region. Cooperation with offshore teams. * Knowledge transfer preparation to offshore team * Direct end user support * New requirements verification * Participation in change management process - impact analysis, Change Authorization Board meetings * Coordination of offshore support team (tickets monitoring, tasks assignment - BMC Remedy software) * Verification of solutions provided by offshore team * UAT results verification in HP QC
01.01.2012 — Now
Zelmer SA
Implementation of purchasing processes based on MRP, contracts and scheduling agreements in production plant. * Blue print preparation * System configuration: contracts and scheduling agreements, approval process, consumption based MRP * Printouts preparation (SMARTforms) * Purchasing data upload * Go-live preparation and post go-live support
01.01.2011 — Now
Kraft Foods Polska
Migration / roll-out of Cadbury Poland to Kraft's environment in WM area. New system was based on DWMS with HUM, batch management - food production. * Core process verification and GAP analysis * 3PL interface implementation (EDIFACT standard) * Label printing and RF scanners environment preparation (hardware setup, software installation and configuration on RF terminals) * End user training * Data migration from legacy to new SAP system * Post go-live support
01.01.2006 — 31.01.2011
Cadbury Wedel
MM, WM and SD
Several projects in food industry: * Implementation of MM, WM and SD in a new green field factory * Implementation of LE-TRA * Roll-out of Cadbury's European platform to another plant in Poland (MM and WM) * Interface to 3PL provider - dedicated flat files * Interface to mobile sales solution (support of sales processes) * EDI interface with customers (incoming orders, outgoing invoices) Post go-live / business as usual support for above implementations (MM, WM and SD). * As-is analysis and documentation (existing solution) * Workshops with business owners and users, requirements gathering * Gap analysis * Detail design preparation * Blue-print documents preparation * Functional and technical specification preparation for many reports, user exits, enhancements, interfaces, SMARTforms * Developments including reports, BAPI, BAdi, SMARTforms, SAPscripts and Workflows * MM, SD and WM system configuration (storage unit management, UM, inbound and outbound processes, integration with finance) * Label printing configuration - Zebra printers * WebSAPConsole installation and configuration * RF transactions preparation * Test scenarios and scripts preparation * Unit and system tests (HP QC) * End user training * Data upload and migration preparation (preparation of input file formats, LSMW, non-standard conversion program) * Post go-live support * Workflow implementation and administrations (purchasing documents approval, invoice verification) * EDI interfaces implementation and administration
01.05.2005 — 30.11.2005
PTC
System upgrade form 4.5B to 5.0 in MM area. * Initial delta workshops and key-user training * As-is analysis (existing solution) * Additional requirements verification * Customizing adjustments * Developments adjustments * Test scenarios and scripts preparation * Unit and system tests * Post go-live support
01.03.2005 — 28.02.2006
TORFARM
Implementation of MM module as leading consultant in pharmacy retail company. IS Retail implementation. * Initial workshops and key-user training * Workshops with business owners and users, requirements gathering * Gap analysis * Detail design preparation * Blue-print documents preparation * Functional specification preparation for enhancements * Functional and technical specification preparation for interface to external warehouse and transportation planning system * MM system configuration (purchasing, inventory management, automatic postings, invoice verification, batch management). Integration with SD. * Test scenarios and scripts preparation * Unit and system tests * End-users documentation preparation and end-users training * Data conversion and upload * Go-live preparation and post go-live support
01.03.2004 — 31.03.2005
Roto Frank
MM module implementation as leading consultant for production factory * Initial workshops and key-user training * Workshops with business owners and users, requirements gathering * Gap analysis * Detail design preparation * Blue-print documents preparation * Functional specification preparation for enhancements * MM system configuration (purchasing, inventory management, automatic postings, invoice verification, batch management). Integration with SD, PP and QM. * Test scenarios and scripts preparation * Unit and system tests * End-users documentation preparation and end-users training * Data conversion and upload * Go-live preparation and post go-live support
01.03.2004 — 31.08.2004
Several projects covering system extensions resulting from access of Poland to European Union. Projects covered: * Tax codes setup in purchasing and sales for VAT reporting * Pricing procedures adjustments for reporting purposes * Processes and system adjustments for proper INTRASTAT preparation * Intrastat declaration printing and XML file generation Implementations done for the following customers: * British America Tobacco Polska * DaimlerChrysler Automotive Polska * Cadbury Wedel * Ecolab * Danfoss * LEK * Jelfa * Logstor * GU
01.07.2003 — 31.12.2003
Prettlnoma Systems Polska
Rollout of MM and WM to Polish plants. * Core process verification and GAP analysis * Polish SAPscripts preparation * System tests * End user training * Data migration to SAP system * Post go-live support
01.07.2003 — 31.12.2003
Siemens Sp. z o.o.
Implementation of EDI messages with core customer based on XML format (orders, confirmations, invoices). Digital signature of electronic documents implementation (private keys stored in smart-cards). * Requirements verification on both sides * Solution preparation - blue-print * Developments preparation (EDI messages, digital signature) * Infrastructure preparation * Post go-live support
01.01.2003 — 31.12.2003
Glaspol Sp. z o.o.
support coordinator
* Support: requirements gathering, system configuration, functional specification for developments preparation, report modifications (ABAP) * Coordination - tickets monitoring, tasks assignment, resources booking, invoice preparation
01.01.2003 — 31.12.2003
Siemens Sp. z o.o.
SAP R/3 system support in MM and WM area. * Tickets monitoring (Remedy) * Requirements gathering * System configuration * Functional specification for developments preparation * Developments (reports, SAPscripts)
01.02.2002 — 31.01.2003
Siemens Sp. z o.o.
Implementation of MM and WM modules in distribution company. * Initial workshops and key-user training * Workshops with business owners and users, requirements gathering * Gap analysis * Process flows preparation (MS Visio) * Detail design preparation * Functional and technical specification preparation for WRICEF objects * Interfaces preparation to external applications (product master data, prices) * EDI implementation with vendors * MM and WM system configuration, integration with MM, SD and PS * Test scenarios and scripts preparation * Unit and system tests * End user training * Data take over (preparation of input file formats, LSMW, non-standard conversion program) * Cut-over plan preparation * Go-live preparation and post go-live support
01.02.2001 — 31.12.2001
Tenneco Automotive Polska Sp. z o.o.
Implementation of MM and WM modules in automotive industry. * Initial workshops and key-user training * Workshops with business owners and users, requirements gathering * Gap analysis * Detail design preparation * Functional and technical specification preparation for WRICEF objects * EDI implementation with vendors (including JIT related messages) * MM and WM system configuration, integration with MM, SD and PP * Test scenarios and scripts preparation * Unit and system tests * End user training * Data take over (preparation of input file formats, LSMW, non-standard conversion program) * Cut-over plan preparation * Go-live preparation and post go-live support
01.09.2000 — 31.08.2001
BSH Sp. z o.o
Project coordinator
* Project resource management * Schedule preparation * Project progress verification * Project costs monitoring, financial reporting
01.06.2000 — 31.07.2000
Relpol
System upgrade from 3.0F to 4.6C in production plant. * Initial delta workshops and key-user training * Customizing adjustments * Developments adjustments * Unit and system tests * Post go-live support
01.03.2000 — 30.04.2001
Naftobazy Sp. z o.o.
Coordination of project tasks during the second phase of implementation (SD extensions). * Project resource management * Schedule preparation * Project progress verification * Project costs monitoring, financial reporting
01.03.1999 — 29.02.2000
Naftobazy Sp. z o.o.
Implementation of MM module in oil industry (23 plants/locations in Poland). * Initial workshops and key-user training * Workshops with business owners and users, requirements gathering * Detail design preparation * Functional and technical specification preparation for WRICEF objects * MM system configuration, integration with SD * Test scenarios and scripts preparation * Unit and system tests * End user training * Data take over (preparation of input file formats, LSMW, conversion in MS Access) * Go-live preparation and post go-live support
01.09.1998 — 31.07.1999
Relpol
Implementation of MM module in manufacturing plant. * Initial workshops and key-user training * Workshops with business owners and users, requirements gathering * Detail design preparation * MM system configuration, integration with SD and PP * Test scenarios and scripts preparation * Unit and system tests * Data take over (preparation of input file formats; standard and bespoke programs) * Go-live preparation and post go-live support
01.08.1998 — 30.06.2000
Raab Karcher Energy Services
System upgrade from 2.2 to 3.1 in MM area. * Customizing adjustments * Unit and system tests * Post go-live support
01.06.1998 — 28.02.1999
Cadbury
Support of MM and WM area in production plant (food industry). * Tickets monitoring * Requirements gathering * System configuration * Functional specification for developments preparation
01.01.1998 — 31.12.1998
ZWUT S.A.
Implementation of MM and WM in production plant. * Initial workshops and key-user training * Workshops with business owners and users, requirements gathering * Detail design preparation * Functional and technical specification preparation for WRICEF objects * MM and WM system configuration, integration with SD * Test scenarios and scripts preparation * Unit and system tests * Data take over (preparation of input file formats, LSMW, conversion in MS Access) * Go-live preparation and post go-live support

Description

SKILLS
- good knowledge of MM (8 full cycles + 3 roll-outs + 4 upgrades + support)
- good knowledge of WM (5 full cycles + 2 roll-outs + 1 upgrade + support)
- EWM implementation – 1 project
- SD (basic configuration, main processes: 1 full cycle + 1 upgrade + support) - LE-TRA Transport (1 full cycle)
- Logistic Execution – selected functionalities as part of all projects

Bar codes:                           
Good knowledge of pallet identification (EAN/GS1 logistic pallet label), Odette shipping labels in automotive.
Five full implementations of bar codes printing and scanning (Zebra and Intermec printers; Symbol/Motorola/Zebra and Intermec RF terminals). Configuration of WebSAPConsole and ITS Mobile.
Several small support projects involving bar codes, Storage Units or HUM.

Data take over:                 
Good knowledge of LSMW and standard SAP’s programs; non-standard ABAP programs preparation (BAPI, batch-inputs)
EDI / IDOC / ALE:              
Good knowledge (4 full cycles + 1 roll-out) including blueprint, customizing, development and administration. This covers:
- orders, shipping notifications and invoices with customers
- orders and invoices with vendors
- interface with distribution centres/3PLs (several message types)
Basic knowledge of SAP Business Connector 4.6 and SAP PI/XI
ABAP programming:        
Good knowledge covering preparation of rep

Main Skills

Other Skills

ABAP BAPI MS Access SAPscript XML Digital signature Data conversion tablets SAP PI SQL optimization debugging SAP EWM Object oriented programming system configuration SAP R/3 ABAP programming Zebra software installation IDOC XML files SAP Data migration SAP Business Connector MS Visio

Work & Experience

01.06.2016 — 31.07.2017
Boots
SAP EWM implementation for production plants (in UK and France). Cosmetics/pharmacy industry - extra requirements resulting from MHRA regulations. Integration of EWM with MM, SD, PP and QM. * Workshops with business owners and users, requirements gathering * Process flows preparation (MS Visio) * Detail design preparation * Technical specification preparation for RICEF objects * RFC, CIF and data replication setup between ERP and EWM systems * ERP and EWM system configuration (batch management, handling unit management, classification, inbound and outbound processes, integration with MM, SD, PP and QM) * Label printing configuration and development - SATO printers * ITSMobile configuration and RF screens modifications for hand-held terminals * Data upload and migration preparation in EWM (input file formats preparation, LSMW preparation, non-standard program preparation) * BAdi implementation, SMARTforms modifications * Cut-over plan preparation * Test scenarios and scripts preparation * Unit and system tests
01.12.2015 — 30.06.2016
ZCh Siarkopol
Designing and developing interface between SAP R/3 and B2B system based on XML files (master data replication, sales orders creation, orders confirmation sending). * Solution / flows preparation * XML file formats preparation * Interface program preparation in SAP system (full developments) * Technical documentation preparation
01.06.2015 — 31.05.2016
Volvo
Implementation of WM in a new warehouse area and building extensions for existing WM functionality. Bus manufacturing plant. * As-is analysis and documentation (existing solution) * Requirements gathering * Technical documentation preparation for RF transactions, ODETTE label printing, picking transactions (dedicated to mobile tablets) * Developments: RF transactions, label printing (SAPscripts), reports * System configuration * System tests with HP QC * End user training * Go-live preparation and data upload (material master data, storage bins) * Post go-live support
01.01.2014 — 31.12.2015
Sun Garden
WM implementation for a new warehouse in production plant. Enhancements preparation. * As-is analysis and documentation (old existing solution) * Workshops with business owners and users, requirements gathering * Gap analysis * Detail design preparation * Blue-print documents preparation * Functional specification preparation for RF transactions and enhancements * WM system configuration (storage unit management, inbound and outbound processes, integration with MM, SD and PP) * RF transactions development * Test scenarios and scripts preparation * Unit and system tests * Data upload preparation (preparation of input file formats, LSMW) * Go-live preparation and data upload (material master data, storage bins) * Post go-live support
01.01.2013 — Now
Valeo Service Polska
expert consultant
distribution company. * SAP project methodology presentation * Blue print and processes verification * GAP analysis * Verification of functional specifications (extensions - RF transactions, user exits)
01.01.2012 — 31.12.2015
Kraft Foods / Mondelez
Commercial area / Order To Cash (WM, SD, MM) support team lead for EMEA region. Cooperation with offshore teams. * Knowledge transfer preparation to offshore team * Direct end user support * New requirements verification * Participation in change management process - impact analysis, Change Authorization Board meetings * Coordination of offshore support team (tickets monitoring, tasks assignment - BMC Remedy software) * Verification of solutions provided by offshore team * UAT results verification in HP QC
01.01.2012 — Now
Zelmer SA
Implementation of purchasing processes based on MRP, contracts and scheduling agreements in production plant. * Blue print preparation * System configuration: contracts and scheduling agreements, approval process, consumption based MRP * Printouts preparation (SMARTforms) * Purchasing data upload * Go-live preparation and post go-live support
01.01.2011 — Now
Kraft Foods Polska
Migration / roll-out of Cadbury Poland to Kraft's environment in WM area. New system was based on DWMS with HUM, batch management - food production. * Core process verification and GAP analysis * 3PL interface implementation (EDIFACT standard) * Label printing and RF scanners environment preparation (hardware setup, software installation and configuration on RF terminals) * End user training * Data migration from legacy to new SAP system * Post go-live support
01.01.2006 — 31.01.2011
Cadbury Wedel
MM, WM and SD
Several projects in food industry: * Implementation of MM, WM and SD in a new green field factory * Implementation of LE-TRA * Roll-out of Cadbury's European platform to another plant in Poland (MM and WM) * Interface to 3PL provider - dedicated flat files * Interface to mobile sales solution (support of sales processes) * EDI interface with customers (incoming orders, outgoing invoices) Post go-live / business as usual support for above implementations (MM, WM and SD). * As-is analysis and documentation (existing solution) * Workshops with business owners and users, requirements gathering * Gap analysis * Detail design preparation * Blue-print documents preparation * Functional and technical specification preparation for many reports, user exits, enhancements, interfaces, SMARTforms * Developments including reports, BAPI, BAdi, SMARTforms, SAPscripts and Workflows * MM, SD and WM system configuration (storage unit management, UM, inbound and outbound processes, integration with finance) * Label printing configuration - Zebra printers * WebSAPConsole installation and configuration * RF transactions preparation * Test scenarios and scripts preparation * Unit and system tests (HP QC) * End user training * Data upload and migration preparation (preparation of input file formats, LSMW, non-standard conversion program) * Post go-live support * Workflow implementation and administrations (purchasing documents approval, invoice verification) * EDI interfaces implementation and administration
01.05.2005 — 30.11.2005
PTC
System upgrade form 4.5B to 5.0 in MM area. * Initial delta workshops and key-user training * As-is analysis (existing solution) * Additional requirements verification * Customizing adjustments * Developments adjustments * Test scenarios and scripts preparation * Unit and system tests * Post go-live support
01.03.2005 — 28.02.2006
TORFARM
Implementation of MM module as leading consultant in pharmacy retail company. IS Retail implementation. * Initial workshops and key-user training * Workshops with business owners and users, requirements gathering * Gap analysis * Detail design preparation * Blue-print documents preparation * Functional specification preparation for enhancements * Functional and technical specification preparation for interface to external warehouse and transportation planning system * MM system configuration (purchasing, inventory management, automatic postings, invoice verification, batch management). Integration with SD. * Test scenarios and scripts preparation * Unit and system tests * End-users documentation preparation and end-users training * Data conversion and upload * Go-live preparation and post go-live support
01.03.2004 — 31.03.2005
Roto Frank
MM module implementation as leading consultant for production factory * Initial workshops and key-user training * Workshops with business owners and users, requirements gathering * Gap analysis * Detail design preparation * Blue-print documents preparation * Functional specification preparation for enhancements * MM system configuration (purchasing, inventory management, automatic postings, invoice verification, batch management). Integration with SD, PP and QM. * Test scenarios and scripts preparation * Unit and system tests * End-users documentation preparation and end-users training * Data conversion and upload * Go-live preparation and post go-live support
01.03.2004 — 31.08.2004
Several projects covering system extensions resulting from access of Poland to European Union. Projects covered: * Tax codes setup in purchasing and sales for VAT reporting * Pricing procedures adjustments for reporting purposes * Processes and system adjustments for proper INTRASTAT preparation * Intrastat declaration printing and XML file generation Implementations done for the following customers: * British America Tobacco Polska * DaimlerChrysler Automotive Polska * Cadbury Wedel * Ecolab * Danfoss * LEK * Jelfa * Logstor * GU
01.07.2003 — 31.12.2003
Prettlnoma Systems Polska
Rollout of MM and WM to Polish plants. * Core process verification and GAP analysis * Polish SAPscripts preparation * System tests * End user training * Data migration to SAP system * Post go-live support
01.07.2003 — 31.12.2003
Siemens Sp. z o.o.
Implementation of EDI messages with core customer based on XML format (orders, confirmations, invoices). Digital signature of electronic documents implementation (private keys stored in smart-cards). * Requirements verification on both sides * Solution preparation - blue-print * Developments preparation (EDI messages, digital signature) * Infrastructure preparation * Post go-live support
01.01.2003 — 31.12.2003
Glaspol Sp. z o.o.
support coordinator
* Support: requirements gathering, system configuration, functional specification for developments preparation, report modifications (ABAP) * Coordination - tickets monitoring, tasks assignment, resources booking, invoice preparation
01.01.2003 — 31.12.2003
Siemens Sp. z o.o.
SAP R/3 system support in MM and WM area. * Tickets monitoring (Remedy) * Requirements gathering * System configuration * Functional specification for developments preparation * Developments (reports, SAPscripts)
01.02.2002 — 31.01.2003
Siemens Sp. z o.o.
Implementation of MM and WM modules in distribution company. * Initial workshops and key-user training * Workshops with business owners and users, requirements gathering * Gap analysis * Process flows preparation (MS Visio) * Detail design preparation * Functional and technical specification preparation for WRICEF objects * Interfaces preparation to external applications (product master data, prices) * EDI implementation with vendors * MM and WM system configuration, integration with MM, SD and PS * Test scenarios and scripts preparation * Unit and system tests * End user training * Data take over (preparation of input file formats, LSMW, non-standard conversion program) * Cut-over plan preparation * Go-live preparation and post go-live support
01.02.2001 — 31.12.2001
Tenneco Automotive Polska Sp. z o.o.
Implementation of MM and WM modules in automotive industry. * Initial workshops and key-user training * Workshops with business owners and users, requirements gathering * Gap analysis * Detail design preparation * Functional and technical specification preparation for WRICEF objects * EDI implementation with vendors (including JIT related messages) * MM and WM system configuration, integration with MM, SD and PP * Test scenarios and scripts preparation * Unit and system tests * End user training * Data take over (preparation of input file formats, LSMW, non-standard conversion program) * Cut-over plan preparation * Go-live preparation and post go-live support
01.09.2000 — 31.08.2001
BSH Sp. z o.o
Project coordinator
* Project resource management * Schedule preparation * Project progress verification * Project costs monitoring, financial reporting
01.06.2000 — 31.07.2000
Relpol
System upgrade from 3.0F to 4.6C in production plant. * Initial delta workshops and key-user training * Customizing adjustments * Developments adjustments * Unit and system tests * Post go-live support
01.03.2000 — 30.04.2001
Naftobazy Sp. z o.o.
Coordination of project tasks during the second phase of implementation (SD extensions). * Project resource management * Schedule preparation * Project progress verification * Project costs monitoring, financial reporting
01.03.1999 — 29.02.2000
Naftobazy Sp. z o.o.
Implementation of MM module in oil industry (23 plants/locations in Poland). * Initial workshops and key-user training * Workshops with business owners and users, requirements gathering * Detail design preparation * Functional and technical specification preparation for WRICEF objects * MM system configuration, integration with SD * Test scenarios and scripts preparation * Unit and system tests * End user training * Data take over (preparation of input file formats, LSMW, conversion in MS Access) * Go-live preparation and post go-live support
01.09.1998 — 31.07.1999
Relpol
Implementation of MM module in manufacturing plant. * Initial workshops and key-user training * Workshops with business owners and users, requirements gathering * Detail design preparation * MM system configuration, integration with SD and PP * Test scenarios and scripts preparation * Unit and system tests * Data take over (preparation of input file formats; standard and bespoke programs) * Go-live preparation and post go-live support
01.08.1998 — 30.06.2000
Raab Karcher Energy Services
System upgrade from 2.2 to 3.1 in MM area. * Customizing adjustments * Unit and system tests * Post go-live support
01.06.1998 — 28.02.1999
Cadbury
Support of MM and WM area in production plant (food industry). * Tickets monitoring * Requirements gathering * System configuration * Functional specification for developments preparation
01.01.1998 — 31.12.1998
ZWUT S.A.
Implementation of MM and WM in production plant. * Initial workshops and key-user training * Workshops with business owners and users, requirements gathering * Detail design preparation * Functional and technical specification preparation for WRICEF objects * MM and WM system configuration, integration with SD * Test scenarios and scripts preparation * Unit and system tests * Data take over (preparation of input file formats, LSMW, conversion in MS Access) * Go-live preparation and post go-live support

Attachments