avatar

Engineer Chemical

Score
100%
Experience:
26 y
Score
100%
Experience:
26 y
Location:
Bogota
Last update:
20.04.2021
Register to Contact Freelancer
Available
Onsite hourly: 26 €
Remote hourly: N/A
Spanish: Native
English: Basic knowledge
YES, I have flexibility Location anywhere in the world.
SKILLS
Experience in managing, directing and organizing operations at plants producing chemicals , ease of extraction, separation and storage of Raw Thermal generation of power and steam , oil refining , wastewater treatment plants and industrial water , and plants chemical manufacturing .
Experience in supervising, controlling technically and administratively project implementation; in controlling time, cost, quality and budgets; ensuring compliance with the correct implementation schedule. Responsible for the development and results of a project.
Experience as a process to review the development of detailed engineering projects Refining and Petrochemical Ecopetrol SA and track the safety checklist process for pre - boot, using the full and simplified models.
Experience in electromechanical assemblies for the Upstream and Downstream processes, performing Supervision, Inspection and Technical field and administrative agencies during the construction and assembly of the various static equipment, piping and rotating.
Preparing communications for technical answers and clarifications to the contractor.
Ability and experience in personnel management, report delivery and interaction with interdisciplinary teams, teamwork and good interpersonal skills.
Capacity and Experience as Process Engineer in design and / or review of engineering for the implementation of projects for Oil & Gas industry, chemical plants and / or petrochemical.
Capacity and Experience in Production, Mechanical Maintenance of plants, as well as in implementation and monitoring of projects.
Operation Engineer Experience in the Chemical Control Treatment, Production and Supply of Water for Drinking Water System, High Pressure Watertube Boilers used in power plants and steam, and water reinjection well for extracting crude.
Experience in the management of chemical
API SAS
23.05.2015 — 04.10.2015
MORELCO S.A.S
SUPPORT ENGINEER O & M
MORELCO S.A.S Company Building, installation and O & M Cra 13A No. 98 -. 75 Tel. PBX (1) 5188880 Bogota Office POSITION: SUPPORT ENGINEER O & M Period: May 23, 2015 to October 4, 2015 FUNCTIONS * Ensure production results and quality of oil, water and sludge set for Acacias station 30K for the treatment of raw water and mud making a safe and reliable operation of the station, and meet production and quality levels projected by the organization to achieve the ultimate customer satisfaction. * Perform technical reports concerning the behavior of the operation of the acacias 30K impacts station to reduce deviations in the production and quality of the products and / or products generated in the different treatments of oil, water and sludge production. * Controlling Operations Acacias Station 30K to optimize the handling of human resources, consumables, equipment and machinery used in the operation. * Optimization of operating costs of the station. * Conduct support, monitoring, supervision and evaluation of staff performance operation 30K Acacias station. * Ensure high performance and operational personnel guidance to ensure high quality results and products. * Comply with the provisions of the contractual scope of the operation of the "Engineering for the supply of crude oil dehydration system 30KBOPD and water treatment in 300 KWBPD ACACIAS station" by making the corresponding recommendations to implement corrective actions when there are any deviations. * Provide technical and administrative operation Acacias Station 30K and / or other production fields to assign the company, ensuring the operation of the treatment process of crude oil, water and mud, including ancillary services. * Saving the oil treatment processes, water and sludge for Operation 30K acacias station to avoid any problem that can not keep in operation. * Attend systematic follow-up meetings with the client and contractors ready for operations. * Assess, monitor and approve the various controls of changes that arise during the operation of the station 30K acacias. * Actively participate in workshops to analyze operational risks (such as HAZOP, LOPA, WHAT IF, HAZID), track and control the actions that arose in the HAZOP workshop, ensuring revision design and detailed engineering verify its implementation in 30K acacias station. * Provide technical and administrative support quality audits made to the operation of the station 30K acacias and participate in the preparation of documents and reports of non-compliance of the operation process. * Provide technical support to the various specialties intended for the operation and construction of the station 30K acacias. * Validate records daily production reports, electronic logbook and records prepared by process control operators Acacias Station 30K and make recommendations to the respective faults presented during Operation 30K Acacias station. * To enter, review and validate the notice of assessment of production used to produce monthly billing. * Be responsible for the smooth operation of process equipment for treatment of raw water, electrostatic treater, ACPI, filters, decanters, Flotation, Pumps * Check, validate and review contingency plan and Shutdown protocol defined for 30K acacias station. * Coordinate laboratory tests and field trials or are ahead in 30K Acacias station in crude oil treatment systems, water and sludge production during the operation of the station in order to verify compliance with standards and specifications You agreed. * Address, process and promptly resolve any consultation of staff of operations and maintenance of the documents submitted by the project engineering, process description, Philosophy of controls, procedures, instructions, technical specifications or on the interpretation of drawings, P & IDs, according with the guidelines established by ECOPETROL * Reporting of opportunities for improving the design of the 30K Acacias station to provide a safe and reliable operation with contractors and coordinate the implementation thereof prior approval of the project manager.
11.12.2014 — 24.05.2015
ENGINEERING VQ S.A.S
PROCESS SPECIALIST
ENGINEERING VQ S.A.S Engineering and Consultancy Company Bogota Office . Cra 7 Bis No. 124-10 Tel. (571) 5188487 TITLE: PROCESS SPECIALIST Period: December 11, 2014 to May 24, 2015 FUNCTIONS The functions performed for the agreement between SAS and VQ-Engineering OCENSA (Central Pipeline SA) whose scope defined for the technical and administrative-financial-legal Labor Supervision and HSE EPCM contract for the project "Increase of the nominal capacity pipeline Cusiana - Coveñas KBPD 135 (P-135), is summarized below: * Review and comment on a timely basis technical studies, designs, documents and plans developed during Basic and detailed engineering project P135.Verificando compliance, codes and standards. * Respond to technical questions (TQS) field generated during construction and / or which OCENSA request. * To monitor comments to records and TQS deliverables generated during the development of engineering. * Participate in workshops Constructability and analysis of operational risks, such as HAZOP, LOPA Sil, WHAT IF, HAZID, MODEL DESIGN REVIEW, submitted the respective report. * Review and comment on the purchase documents (MR's) of equipment to be purchased by the EPCM Contractor. * Attend meetings of joint work planned by the EPCM Contractor, controller and OCENSA. * Perform Quality Assurance Engineering.
03.10.2014 — 10.12.2014
BUREAU VERITAS COLOMBIA LTDA
PROCESS SPECIALIST PRE COMMISSIONING
BUREAU VERITAS COLOMBIA LTDA Consulting firm Group QA / QC Pre, Commissioning and Start Office Villavicencio, Colombia Cel. 3162516507 TITLE: PROCESS SPECIALIST PRE COMMISSIONING START Period: October 3, 2014 to December 10, 2014 FUNCTIONS * Develop procedures for Pre-commissioning and Commissioning 3.4 and STAP STAP 6 Acacias + 30K; for early boot sludge, water, oil Castilla project. * Classification of systems and subsystems of the projects assigned to the group for Commissioning Commissioning array of different STAP of Castile, with its monitoring and control for preparation of the implementation of the systems. * Assistance and coordination workshops and HAZOP WhatIf * Preparation of minutes of commitments to allies intended for the project. * Organization of regular meetings with the participants advance interdisciplinary project group Rotary Mechanical, Piping, Instrumentation and Control Civil.
14.08.2014 — 02.10.2014
CONSORTIUM FTF - FCUB LTDA
CONSORTIUM FTF - FCUB LTDA Consulting and Engineering Company Office Villavicencio, Colombia Calle 20 # 39-17 Cel. 3156582649 Position. PROCESS LEADING SPECIALTY Period: August 14, 2014 to October 2, 2014 FUNCTIONS * Lead assembly, Pre-commissioning, Commissioning, civil, mechanical, electrical and instrumentation works required for commissioning and operation of the water treatment plant (Water Island) for Suria Thermoelectric Central, ECOPETROL CENTRAL REGIONAL MANAGEMENT SA ". * Review detailed engineering for the relocation of existing water plant and interconnection of an integrated unit RO - EDI * To support the project group for the execution of the various works of interconnection of new production units for water turbines LM6000 * Assistance and coordination of systematic socialization meetings with the operational area of ??ECOPETROL SA. * Document Consolidation scope and understanding of the detailed engineering for the installation of the new unit of GE Water Island to existing systems Termosuria. * Provide timely financial reports of the project implementation * Make timely and correct billing of the services offered by the organization with all their supports * Plan, implement and monitor the project implementation strategy in the areas of quality, safety, cost, materials, and construction progress. * Optimizing human resources and its implementation strategy for the duration of the project. * Making workshops Lessons Learned * To comply with the rules on SSOMA
18.07.2014 — 09.08.2014
ANSALL LTDA
LEADER OF PROCESS
ANSALL LTDA Advisory and Consulting Company In the area of ??Petroleum Engineering Office: Cra. 18 No. 5N-27 Granada-Piedecuesta Quinta. Phone 6552423 CARGO: LEADER OF PROCESS Base Project: GPY Orito, Putumayo Period: July 18, 2014 to August 9, 2014 FUNCTIONS * Ensure quality and integrate the work undertaken by different engineers in their disciplines * Participate in defining the issue and all documents specialty process. * Attend technical meetings with ECOPETROL SA * Update standard process documentation discipline * Maintain permanent contact with the technical coordination of the project * Conduct a review of the documents issued by other specialties * Coordinate the activities of their specialty group * Ensure and monitor the program of work, progress and resource consumption of discipline * Ensure the quality of the documents prepared by the technical group
30.05.2014 — 17.07.2014
BUREAU VERITAS COLOMBIA LTDA
BUREAU VERITAS COLOMBIA LTDA Consulting firm Group QA / QC Commissioning Office Villavicencio Cel. 3162516507 CARGO: SPECIALIST PRE COMMISSIONING AND START PROCESS Period: May 30, 2014 to July 17, 2014 FUNCTIONS * Classification of systems and subsystems of the projects assigned to the group of Commissioning for the commissioning of the STAP array of ApiaySuría and Reform, with its monitoring and control for preparation of the implementation of the systems. * Development of procedures Pre-commissioning and commissioning of the ATK-107 Boot Gas and Gunbarrel, Pilots Injection, PIA, ground and water injection project STAP APIAY-SURIA-REFORM * Assistance and coordination for conducting HAZOP tracking and listing RSPA complete model * Preparation of minutes of commitments to allies intended for the project. * Organization of regular meetings to advance the interdisciplinary group.
01.04.2014 — 21.05.2014
PROFESSIONAL WORKERS COOPERATIVE LTD
PROFESSIONAL WORKERS COOPERATIVE LTD CTP Business Consulting and Supervision Corporate Office Costs Carrera 19 No. 5N -11 Fifth Granada PBX +57 (7) 6559965 - 6542255 POSITION: PROFESSIONAL FULL ING. PROCESS Period: April 1, 2014 to May 21, 2014 FUNCTIONS * Perform Conceptual Approach for the implementation of a system of injection and receipt of Geometric Elements in a selected pipeline , according to the rules of Ecopetrol SA , covering the design of skates, and protective systems to process and instrumentation lines and adequacy facilities at stations and traps office receipt and recirculation system * Development of deliverables specialty process for the development of the Conceptual Engineering * Plan Review P &IDs , PFD , process and deliverables Planimeters Documents Conceptual Engineering * Design, Analysis and Evaluation of Alternative for project implementation * general and specific description of the scope of the specialty to develop the Conceptual Process Engineering Construction Dosing Skids DOE and COE Collection * Development of Bases and Design Criteria to be followed in the development of the Conceptual Engineering * Interaction with the Interdisciplinary Group for the development of the Conceptual Engineering * Consolidation Scope Document Conceptual Engineering * Preparation of Technical Reports and Executive
01.08.2011 — 31.10.2011
EFITEC LTDA
PRODUCTION PLANT CONSULTANT
EFITEC LTDA FERTILIZER COMPANY AND AGRICULTURAL SUPPLIES AvAmbala No 98-31 IBAGUE - TOLIMA - COLOMBIA PHONE : (098) 2714871 or 2716516 POSITION: PRODUCTION PLANT CONSULTANT Period : August - October 11, 2007 FUNCTIONS * Optimize Granulator reactor for the production of complex fertilizers Phosphate , with daily production of 1 Ton , Development of Isometric diagrams and plant processes solid and liquid fertilizers , inventory control and ordering of raw materials for the development of production operations.
09.02.2009 — Now
CONSORTIUM APPLUS
PROCESS ENGINEERS
CONSORTIUM APPLUS + COLOMBIA Business Consulting and Supervision Barrancabermeja Office Street 54 # 24-64 PBX 6112812 POSITION: PROCESS ENGINEERS Period: 09 February 2009 at September 30, 2013 Period 23 December 2013 A February 28, 2014 FUNCTIONS * Plan Review P &IDs,PFD, Planimeters processes and deliverables developed in the Detail Engineering * Evaluate proposed changes or amendments submitted in the development of EPC Project water PMSI * Review of Technical and Financial offer for the purchase of new units Ultrafiltration and Reverse Osmosis for GRB * To coordinate and ensure the processing of clarifications, revisions between mounting Contractors responsible for the design and Licensors. * Develop technical documentation for pre-contract processes required by the EPC Water Project * Participate in the direct purchase of two (2 ) Water Treatment Plant by the methods of Ultrafiltration and Reverse Osmosis for Ecopetrol SA * Perform ensuring compliance with design criteria and specifications to be followed in implementing the project. * Review of development of the detailed engineering for the interconnection of the new units to existing plants and Balance in Refinery * Field Supervision for assembly and interconnection the new water refinery plant using reverse osmosis technology. * Support other disciplines to the development of the Project * Review of technical reports generated by the EPC Contractor. * Preparation of Minutes of meetings where officials involved Ecopetrol and Contractor Position. * Monitoring and control checklist for security of preboot process, using the full and simplified models. * Development and coordination of procedures for the pre - commissioning,commissioning , commissioning of systems and sub ??- systems and stabilization plant project scope . * Prepare responses and controls to bring change requests that arose during the development of detailed engineering. * Assessment HAZOP for PMSI project, Industrial Services Master Plan , Water EPC2 follow on completed making recommendations and ensuring its implementation. * Participation in workshops Analysis EPC2 consequence for the water project , establishing the technical alternatives for implementation.
01.10.2008 — 28.02.2009
BOHORQUEZ AND ENGINEERING LTDA
PROCESS ENGINEERS
BOHORQUEZ AND ENGINEERING LTDA PROJECTS AND ENGINEERING COMPANY Calle 94 No 21 - 55 Bogotá DC Tel 6224760 POSITION: PROCESS ENGINEERS Period October 2008 to February 2009 FUNCTIONS * Evaluation of projects for refineries Ecopetrol Using IRDP methodology (Project Definition Rating Index View) with Project maturity model applied by Ecopetrol SA in its different phases. * Give VoBo for purchases of boilers and water treatment plant using reverse osmosis technology to implement Ecopetrol refinery in Barrancabermeja. * Some projects evaluated by this methodology we can cite oil mist lubrication , Construction Module II STAP (Water Treatment System ) for Acacias , among others.
01.10.2007 — 08.09.2008
TECHNICAL STUDIES S.A.; Campo Caño Limón / Campo Caricare Arauca
PROJECT CONTROLLER PROCESS MECHANICS - V9 / Q5
TECHNICAL STUDIES S.A. ENGINEERING COMPANY and auditing Cra 7 No. 60A - 51 Bogota DC Phone: (1) 3100811 POSITION: PROJECT CONTROLLER PROCESS MECHANICS - V9 / Q5 Location: PACIFIC RUBIALES CPF Field Goal Campo Caño Limón / Campo Caricare Arauca Period: From October 2007 to September 8, 2008 FUNCTIONS * Technical, administrative and financial in the proposed expansion of the production facility for internal auditing Caricare OXY * Electromechanical Assembly to treat a Battery Fluid KBD 50,000 from wells in the location , installation and assembly of three ( 3) heat treaters , five (5) heat exchangers, three ( 3) boilers for steam generation one (1 ) scrubber for gas evacuation , following the rules laid API , ASTM, and releasing the welds by means of methods of non -destructive testing, liquid penetrant , radiography, assembling a network system against provisional and final fire , construction three (3 ) , production tanks 3000.15000 capabilities and 25000 barrels . * Change Order Creation for conducting field work * Mechanical and Electromechanical erection of rotary and static equipment , Gum Barrels , 10,000 barrels of crude recovery capacity , quality control in prefabrication and assembly of the internal parts of Gum Barrels , Heated treaters , separators in field production
01.06.2007 — 31.07.2007
PROASEM LTDA
PROJECT ENGINEER
PROASEM LTDA CONSULTING AND ENGINEERING COMPANY Cra47 A No 118-36 BOGOTA DC - COLOMBIA PHONE : (091) 6377876 POSITION : PROJECT ENGINEER Period: June-July 2007 FUNCTIONS * Data Collection Process for the preparation of technical documentation on the project of Basic and Detailed Engineering of Dynamic Systems Measurement of Crude measuring stations of the Superintendent of Operations Ecopetrol SA in Apiay . * Preparation of Isometrics - Plot Plan of measuring stations * Completing the list deTieins , Design criteria and process description , etc. .
27.03.2007 — 17.05.2007
TWM TOTAL WASTE MANAGEMENT MASA - MECHANICAL ASSOCIATES
PLANT OPERATIONS CONSULTANT
TWM TOTAL WASTE MANAGEMENT MASA - MECHANICAL ASSOCIATES COMPANY SOLID WASTE TREATMENT KM 11 VIA GUACIRCO Neiva - Huila - COLOMBIA PHONE : (098) 8716018 POSITION : PLANT OPERATIONS CONSULTANT Period : 27 March 2007 until 17 May 2007 FUNCTIONS * Perform the classification of transactions and inventory the various teams that make up the plant to place them the Tag ID . * Perform different operating procedures for pre - start , start-up and stabilization of thermal desorption units , unit Sludge Treatment , Water Treatment unit , solids treatment unit . * Give technical support for the implementation of ISO 14001, Environmental management focused , advise operations to increase efficiency in plant productivity Thermal desorption .
07.10.2006 — Now
ELINTE SA ESP CLEAN NOW AND SPECIAL INTEGRAL TECHNOLOGIES
HEAD OF PRODUCTION PLANT
Phone - Ground 4240364 4818602 ô Title: HEAD OF PRODUCTION PLANT Period: October 7, 2006 By February 2007 FUNCTIONS * Manage, monitor and control operations in industrial waste incineration plant productivity by ensuring a safe and efficient way of meeting the goals established productivity. * Management and control of operating costs * Coordination of Industrial Waste Collection of different Clients * Coordination and HSE program implementation and support in the implementation of the ISO 18001 standard focused on Industrial Safety and Occupational Health.
03.06.2003 — 07.08.2006
COLOMBIAN FERTILIZERS SA - ABOCOL
PRODUCTION ENGINEER
COLOMBIAN FERTILIZERS SA - ABOCOL - PETROCHEMICAL COMPANY AND FERTILIZERS Km 11 Vía Mamonal Cartagena - Bolívar Phone - 095 Plant - 6685000-6688300 Title: PRODUCTION ENGINEER Period: June 3, 2003 to August 7, 2006 FUNCTIONS * Manage, monitor and control operations in the complex NPK fertilizer production ensuring a safe and efficient manner in compliance with established production goals and quality. * Monitor and manage staff of operators, contractors arranged in production operations in different areas of the plant , utilities , finished product warehouse , storage of raw materials, washers areas , Hoppers, Granulator , Panel builders reactors . * Runs service requests for maintenance shutdowns and meet the different mechanical, electrical and electronic equipment failures that arise in the production process, ensuring the availability and reliability of equipment to produce under optimal conditions. * Propose and undertake continuous improvement on the ground. * Run programs HSE, safety, health and environment of the plant , meeting the requirements of ISO 9001 , ISO 14001 and OHSAS 18001 * Creation and implementation of the various procedures and operational instructions for starting and stopping the plant.
01.02.2003 — 31.05.2003
PAN AMERICAN CHEMICAL - PQP - CHEMICALS COMPANY
PLANT MANAGER
PAN AMERICAN CHEMICAL - PQP - CHEMICALS COMPANY Muna Industrial Zone Phone - 7198732 Floor Title: PLANT MANAGER Period : February 2003 to May 2003 FUNCTIONS * Manage, monitor and control operations and factory production of sulfuric acid, Oleum , Sodium Bisulfite , Ferrous Sulfate Mono hydrate , Heptahydrate , Micronized Sulfur in a safe and efficient manner meeting the goals established production , control and management of Quality Laboratory products , production program management Jade Edward, Control and Management of inventories of finished goods and Commodities .
01.11.2000 — 30.06.2002
OILFIELD EQUIPMENT SERVICES LTD
OILFIELD EQUIPMENT SERVICES LTD OPERATION AND MAINTENANCE COMPANY MECHANICAL GAS / OIL . BP (British Petroleum) 11th career No. 93-67 Bogotá DC Telephone Plant Cusiana 098 -6346363 / 6346490 Tauramena , Casanare Title: INGENIERODE OPERATION and PRODUCTION Period: November 2000 to June 2002 FUNCTIONS * Process Engineer and operation of a water injection plant , crude separation and pumping , responsible for coordinating the pre - start , start-up and stabilization , including control of the operation and maintenance of the plant. Optimization for plant startup in cold and hot , managing the different needs of spare parts for different team that made the plant, ejector vacuum pump high pressure hydrociclones , tanks , agitators , blowers , pneumatic valves , electric valves , manual valves , water pipelines at high pressure vacuum pumps , mud pumps , high pressure pumps and WEIR IDP to monitor and detect different corrosion problems in equipment, piping and plant. Participation with the group integrity of tank inspections in confined space and making recommendations to the terms of reference for the application of interior painting of tanks, as well as the participation. Review of cathodic protection programs of the different lines and systems of plant water reinjection Phase II. In addition I count with extensive knowledge of operating procedures and systems of work permit as well as the application of the rules of HSE ( Hygiene , security and environmental ) . I have a certificate of competence in HSE operations Cusiana , Coordination boot Treatment Plant Water and Gas. * Coordinate and control the operation and process of the various equipment and systems installed plan for effective treatment of fluids from oil wells and meet production goals and safety requirements. * Coordinate the various works executed plan to achieve within the time determined the requirements of the company. * Inspections Tank integrity, fire systems, degassing tower . * Ensure that the activities of production and realization of different maintenance are developed under the strict rules of industrial safety and the procedures and policies established by the company are met. * Managing human resources under my charge, by directing it towards the goals set by the company. * Coordination of Work Safe , and conducting risk analysis and assessment for the different activities . * Complete Management System Work Permit. * Full management policies HSE (Hygiene , Health Safety and Environment ) * Knowledge of Treatment and Chemical Analysis Crude, Gas and Water Produced water injection.
01.10.1994 — 31.08.2000
CENTRAL TERMOELECTRICA CARTAGENA; TERMOCARTAGENA S.A. E.S.P
Engineer Area of Operation and Environmental Chemistry
CENTRAL TERMOELECTRICA CARTAGENA POWER GENERATION COMPANY TERMOCARTAGENA S.A. E.S.P Km 4 TrackMamonal , Tel 6685051 Cartagena de Indias, Bolivar Title: Engineer Area of Operation and Environmental Chemistry Period: October 1994 to August 2000 FUNCTIONS * Reply by the process and operation of boilers and water quality of the water treatment plants , physicochemical analysis and implementation of the Chemical treatment of water used for feeding high pressure boilers for steam generation & energy cooling towers . * Determining causes of problems in plants. * Completing the consumption rate control and inventory of chemical products for three ( 3) different cooling systems at the plant. * Command and Control a group of four ( 4) Chemical Laboratory analysts and six (6 ) Chemical Control operators condensate cycle - steam for three ( 3) High-pressure boilers . * Ensure the implementation of the Environmental Control Programs to meet the terms required by Colombian law * Inspections Condensers, Boilers , Compressors, Cooling Tower , Tower Including Vacuum Hydro test, Tanks , Pipe, Valves , Networking Against fire, efficiency analysis , etc. . * Ensure compliance with the Standards of Occupational Health and Safety in handling Chemical products according to the requirements requested by the OHSAS 18001 standard , implementation and follow-up required by requsitos ISO 9000 quality standards . * Coordination of work for changes resins , activated carbon , sand in water plants . * Determination of stock and Chemical Reagents used in plant and Chemical Laboratory , including the management of Regenerating Hydrochloric acid and sodium hydroxide . * Coordination and organization of the activities of the Chemical Laboratory , sampling Natural Gas.
01.01.1994 — 30.09.1994
ASFALTOS NORTH SA
Operations Engineer
ASFALTOS NORTH SA ASPHALT PRODUCTION COMPANY RUSTY OIL DERIVATIVE Plant Road Salgar , Barranquilla Title: Operations Engineer Period: January 1994 to September 1994 FUNCTIONS Responsible in the area of ??process operating a production plant oxidized asphalt and its derivatives , taking the operation of a boiler and packaging and shipping the product, review the analysis control Quality in the Production of Oxidized Asphalt and Derivatives for product release , coordinating the work to be performed in Plants and marketing products.
01.01.1990 — 31.12.1993
CORELCA. ELECTRIC CORPORATION ATLANTIC COAST.; ZEITLICHE UND RÄUMLICHE VERFÜGBARKEIT
Assistant Environmental Engineer Party
CORELCA. ELECTRIC CORPORATION ATLANTIC COAST. URRA I Hydroelectric Project Office Executive Center II. Kra 55 # 72 - 109.Tel. 3560200. Barranquilla Position: Assistant Environmental Engineer Party Period: January 1990 to December 1993 FUNCTIONS * Development of Terms of Reference for hiring conducting Environmental Studies in Thermal and hydroelectric projects. * Technical Support on Water Quality Studies and results analysis in the Urra hydroelectric project I. * Participation in the preparation of technical reports related to planning , coordination of environmental activities CORELCA generation plants . * Nationwide Participation in meetings of the Colombian electricity sector Environmental Committee - CASEC - ZEITLICHE UND RÄUMLICHE VERFÜGBARKEIT YES, I have flexibility Location anywhere in the world. SONSTIGE ANGABEN

Description

SKILLS
Experience in managing, directing and organizing operations at plants producing chemicals , ease of extraction, separation and storage of Raw Thermal generation of power and steam , oil refining , wastewater treatment plants and industrial water , and plants chemical manufacturing .
Experience in supervising, controlling technically and administratively project implementation; in controlling time, cost, quality and budgets; ensuring compliance with the correct implementation schedule. Responsible for the development and results of a project.
Experience as a process to review the development of detailed engineering projects Refining and Petrochemical Ecopetrol SA and track the safety checklist process for pre - boot, using the full and simplified models.
Experience in electromechanical assemblies for the Upstream and Downstream processes, performing Supervision, Inspection and Technical field and administrative agencies during the construction and assembly of the various static equipment, piping and rotating.
Preparing communications for technical answers and clarifications to the contractor.
Ability and experience in personnel management, report delivery and interaction with interdisciplinary teams, teamwork and good interpersonal skills.
Capacity and Experience as Process Engineer in design and / or review of engineering for the implementation of projects for Oil & Gas industry, chemical plants and / or petrochemical.
Capacity and Experience in Production, Mechanical Maintenance of plants, as well as in implementation and monitoring of projects.
Operation Engineer Experience in the Chemical Control Treatment, Production and Supply of Water for Drinking Water System, High Pressure Watertube Boilers used in power plants and steam, and water reinjection well for extracting crude.
Experience in the management of chemical

Main Skills

Other Skills

API SAS

Work & Experience

23.05.2015 — 04.10.2015
MORELCO S.A.S
SUPPORT ENGINEER O & M
MORELCO S.A.S Company Building, installation and O & M Cra 13A No. 98 -. 75 Tel. PBX (1) 5188880 Bogota Office POSITION: SUPPORT ENGINEER O & M Period: May 23, 2015 to October 4, 2015 FUNCTIONS * Ensure production results and quality of oil, water and sludge set for Acacias station 30K for the treatment of raw water and mud making a safe and reliable operation of the station, and meet production and quality levels projected by the organization to achieve the ultimate customer satisfaction. * Perform technical reports concerning the behavior of the operation of the acacias 30K impacts station to reduce deviations in the production and quality of the products and / or products generated in the different treatments of oil, water and sludge production. * Controlling Operations Acacias Station 30K to optimize the handling of human resources, consumables, equipment and machinery used in the operation. * Optimization of operating costs of the station. * Conduct support, monitoring, supervision and evaluation of staff performance operation 30K Acacias station. * Ensure high performance and operational personnel guidance to ensure high quality results and products. * Comply with the provisions of the contractual scope of the operation of the "Engineering for the supply of crude oil dehydration system 30KBOPD and water treatment in 300 KWBPD ACACIAS station" by making the corresponding recommendations to implement corrective actions when there are any deviations. * Provide technical and administrative operation Acacias Station 30K and / or other production fields to assign the company, ensuring the operation of the treatment process of crude oil, water and mud, including ancillary services. * Saving the oil treatment processes, water and sludge for Operation 30K acacias station to avoid any problem that can not keep in operation. * Attend systematic follow-up meetings with the client and contractors ready for operations. * Assess, monitor and approve the various controls of changes that arise during the operation of the station 30K acacias. * Actively participate in workshops to analyze operational risks (such as HAZOP, LOPA, WHAT IF, HAZID), track and control the actions that arose in the HAZOP workshop, ensuring revision design and detailed engineering verify its implementation in 30K acacias station. * Provide technical and administrative support quality audits made to the operation of the station 30K acacias and participate in the preparation of documents and reports of non-compliance of the operation process. * Provide technical support to the various specialties intended for the operation and construction of the station 30K acacias. * Validate records daily production reports, electronic logbook and records prepared by process control operators Acacias Station 30K and make recommendations to the respective faults presented during Operation 30K Acacias station. * To enter, review and validate the notice of assessment of production used to produce monthly billing. * Be responsible for the smooth operation of process equipment for treatment of raw water, electrostatic treater, ACPI, filters, decanters, Flotation, Pumps * Check, validate and review contingency plan and Shutdown protocol defined for 30K acacias station. * Coordinate laboratory tests and field trials or are ahead in 30K Acacias station in crude oil treatment systems, water and sludge production during the operation of the station in order to verify compliance with standards and specifications You agreed. * Address, process and promptly resolve any consultation of staff of operations and maintenance of the documents submitted by the project engineering, process description, Philosophy of controls, procedures, instructions, technical specifications or on the interpretation of drawings, P & IDs, according with the guidelines established by ECOPETROL * Reporting of opportunities for improving the design of the 30K Acacias station to provide a safe and reliable operation with contractors and coordinate the implementation thereof prior approval of the project manager.
11.12.2014 — 24.05.2015
ENGINEERING VQ S.A.S
PROCESS SPECIALIST
ENGINEERING VQ S.A.S Engineering and Consultancy Company Bogota Office . Cra 7 Bis No. 124-10 Tel. (571) 5188487 TITLE: PROCESS SPECIALIST Period: December 11, 2014 to May 24, 2015 FUNCTIONS The functions performed for the agreement between SAS and VQ-Engineering OCENSA (Central Pipeline SA) whose scope defined for the technical and administrative-financial-legal Labor Supervision and HSE EPCM contract for the project "Increase of the nominal capacity pipeline Cusiana - Coveñas KBPD 135 (P-135), is summarized below: * Review and comment on a timely basis technical studies, designs, documents and plans developed during Basic and detailed engineering project P135.Verificando compliance, codes and standards. * Respond to technical questions (TQS) field generated during construction and / or which OCENSA request. * To monitor comments to records and TQS deliverables generated during the development of engineering. * Participate in workshops Constructability and analysis of operational risks, such as HAZOP, LOPA Sil, WHAT IF, HAZID, MODEL DESIGN REVIEW, submitted the respective report. * Review and comment on the purchase documents (MR's) of equipment to be purchased by the EPCM Contractor. * Attend meetings of joint work planned by the EPCM Contractor, controller and OCENSA. * Perform Quality Assurance Engineering.
03.10.2014 — 10.12.2014
BUREAU VERITAS COLOMBIA LTDA
PROCESS SPECIALIST PRE COMMISSIONING
BUREAU VERITAS COLOMBIA LTDA Consulting firm Group QA / QC Pre, Commissioning and Start Office Villavicencio, Colombia Cel. 3162516507 TITLE: PROCESS SPECIALIST PRE COMMISSIONING START Period: October 3, 2014 to December 10, 2014 FUNCTIONS * Develop procedures for Pre-commissioning and Commissioning 3.4 and STAP STAP 6 Acacias + 30K; for early boot sludge, water, oil Castilla project. * Classification of systems and subsystems of the projects assigned to the group for Commissioning Commissioning array of different STAP of Castile, with its monitoring and control for preparation of the implementation of the systems. * Assistance and coordination workshops and HAZOP WhatIf * Preparation of minutes of commitments to allies intended for the project. * Organization of regular meetings with the participants advance interdisciplinary project group Rotary Mechanical, Piping, Instrumentation and Control Civil.
14.08.2014 — 02.10.2014
CONSORTIUM FTF - FCUB LTDA
CONSORTIUM FTF - FCUB LTDA Consulting and Engineering Company Office Villavicencio, Colombia Calle 20 # 39-17 Cel. 3156582649 Position. PROCESS LEADING SPECIALTY Period: August 14, 2014 to October 2, 2014 FUNCTIONS * Lead assembly, Pre-commissioning, Commissioning, civil, mechanical, electrical and instrumentation works required for commissioning and operation of the water treatment plant (Water Island) for Suria Thermoelectric Central, ECOPETROL CENTRAL REGIONAL MANAGEMENT SA ". * Review detailed engineering for the relocation of existing water plant and interconnection of an integrated unit RO - EDI * To support the project group for the execution of the various works of interconnection of new production units for water turbines LM6000 * Assistance and coordination of systematic socialization meetings with the operational area of ??ECOPETROL SA. * Document Consolidation scope and understanding of the detailed engineering for the installation of the new unit of GE Water Island to existing systems Termosuria. * Provide timely financial reports of the project implementation * Make timely and correct billing of the services offered by the organization with all their supports * Plan, implement and monitor the project implementation strategy in the areas of quality, safety, cost, materials, and construction progress. * Optimizing human resources and its implementation strategy for the duration of the project. * Making workshops Lessons Learned * To comply with the rules on SSOMA
18.07.2014 — 09.08.2014
ANSALL LTDA
LEADER OF PROCESS
ANSALL LTDA Advisory and Consulting Company In the area of ??Petroleum Engineering Office: Cra. 18 No. 5N-27 Granada-Piedecuesta Quinta. Phone 6552423 CARGO: LEADER OF PROCESS Base Project: GPY Orito, Putumayo Period: July 18, 2014 to August 9, 2014 FUNCTIONS * Ensure quality and integrate the work undertaken by different engineers in their disciplines * Participate in defining the issue and all documents specialty process. * Attend technical meetings with ECOPETROL SA * Update standard process documentation discipline * Maintain permanent contact with the technical coordination of the project * Conduct a review of the documents issued by other specialties * Coordinate the activities of their specialty group * Ensure and monitor the program of work, progress and resource consumption of discipline * Ensure the quality of the documents prepared by the technical group
30.05.2014 — 17.07.2014
BUREAU VERITAS COLOMBIA LTDA
BUREAU VERITAS COLOMBIA LTDA Consulting firm Group QA / QC Commissioning Office Villavicencio Cel. 3162516507 CARGO: SPECIALIST PRE COMMISSIONING AND START PROCESS Period: May 30, 2014 to July 17, 2014 FUNCTIONS * Classification of systems and subsystems of the projects assigned to the group of Commissioning for the commissioning of the STAP array of ApiaySuría and Reform, with its monitoring and control for preparation of the implementation of the systems. * Development of procedures Pre-commissioning and commissioning of the ATK-107 Boot Gas and Gunbarrel, Pilots Injection, PIA, ground and water injection project STAP APIAY-SURIA-REFORM * Assistance and coordination for conducting HAZOP tracking and listing RSPA complete model * Preparation of minutes of commitments to allies intended for the project. * Organization of regular meetings to advance the interdisciplinary group.
01.04.2014 — 21.05.2014
PROFESSIONAL WORKERS COOPERATIVE LTD
PROFESSIONAL WORKERS COOPERATIVE LTD CTP Business Consulting and Supervision Corporate Office Costs Carrera 19 No. 5N -11 Fifth Granada PBX +57 (7) 6559965 - 6542255 POSITION: PROFESSIONAL FULL ING. PROCESS Period: April 1, 2014 to May 21, 2014 FUNCTIONS * Perform Conceptual Approach for the implementation of a system of injection and receipt of Geometric Elements in a selected pipeline , according to the rules of Ecopetrol SA , covering the design of skates, and protective systems to process and instrumentation lines and adequacy facilities at stations and traps office receipt and recirculation system * Development of deliverables specialty process for the development of the Conceptual Engineering * Plan Review P &IDs , PFD , process and deliverables Planimeters Documents Conceptual Engineering * Design, Analysis and Evaluation of Alternative for project implementation * general and specific description of the scope of the specialty to develop the Conceptual Process Engineering Construction Dosing Skids DOE and COE Collection * Development of Bases and Design Criteria to be followed in the development of the Conceptual Engineering * Interaction with the Interdisciplinary Group for the development of the Conceptual Engineering * Consolidation Scope Document Conceptual Engineering * Preparation of Technical Reports and Executive
01.08.2011 — 31.10.2011
EFITEC LTDA
PRODUCTION PLANT CONSULTANT
EFITEC LTDA FERTILIZER COMPANY AND AGRICULTURAL SUPPLIES AvAmbala No 98-31 IBAGUE - TOLIMA - COLOMBIA PHONE : (098) 2714871 or 2716516 POSITION: PRODUCTION PLANT CONSULTANT Period : August - October 11, 2007 FUNCTIONS * Optimize Granulator reactor for the production of complex fertilizers Phosphate , with daily production of 1 Ton , Development of Isometric diagrams and plant processes solid and liquid fertilizers , inventory control and ordering of raw materials for the development of production operations.
09.02.2009 — Now
CONSORTIUM APPLUS
PROCESS ENGINEERS
CONSORTIUM APPLUS + COLOMBIA Business Consulting and Supervision Barrancabermeja Office Street 54 # 24-64 PBX 6112812 POSITION: PROCESS ENGINEERS Period: 09 February 2009 at September 30, 2013 Period 23 December 2013 A February 28, 2014 FUNCTIONS * Plan Review P &IDs,PFD, Planimeters processes and deliverables developed in the Detail Engineering * Evaluate proposed changes or amendments submitted in the development of EPC Project water PMSI * Review of Technical and Financial offer for the purchase of new units Ultrafiltration and Reverse Osmosis for GRB * To coordinate and ensure the processing of clarifications, revisions between mounting Contractors responsible for the design and Licensors. * Develop technical documentation for pre-contract processes required by the EPC Water Project * Participate in the direct purchase of two (2 ) Water Treatment Plant by the methods of Ultrafiltration and Reverse Osmosis for Ecopetrol SA * Perform ensuring compliance with design criteria and specifications to be followed in implementing the project. * Review of development of the detailed engineering for the interconnection of the new units to existing plants and Balance in Refinery * Field Supervision for assembly and interconnection the new water refinery plant using reverse osmosis technology. * Support other disciplines to the development of the Project * Review of technical reports generated by the EPC Contractor. * Preparation of Minutes of meetings where officials involved Ecopetrol and Contractor Position. * Monitoring and control checklist for security of preboot process, using the full and simplified models. * Development and coordination of procedures for the pre - commissioning,commissioning , commissioning of systems and sub ??- systems and stabilization plant project scope . * Prepare responses and controls to bring change requests that arose during the development of detailed engineering. * Assessment HAZOP for PMSI project, Industrial Services Master Plan , Water EPC2 follow on completed making recommendations and ensuring its implementation. * Participation in workshops Analysis EPC2 consequence for the water project , establishing the technical alternatives for implementation.
01.10.2008 — 28.02.2009
BOHORQUEZ AND ENGINEERING LTDA
PROCESS ENGINEERS
BOHORQUEZ AND ENGINEERING LTDA PROJECTS AND ENGINEERING COMPANY Calle 94 No 21 - 55 Bogotá DC Tel 6224760 POSITION: PROCESS ENGINEERS Period October 2008 to February 2009 FUNCTIONS * Evaluation of projects for refineries Ecopetrol Using IRDP methodology (Project Definition Rating Index View) with Project maturity model applied by Ecopetrol SA in its different phases. * Give VoBo for purchases of boilers and water treatment plant using reverse osmosis technology to implement Ecopetrol refinery in Barrancabermeja. * Some projects evaluated by this methodology we can cite oil mist lubrication , Construction Module II STAP (Water Treatment System ) for Acacias , among others.
01.10.2007 — 08.09.2008
TECHNICAL STUDIES S.A.; Campo Caño Limón / Campo Caricare Arauca
PROJECT CONTROLLER PROCESS MECHANICS - V9 / Q5
TECHNICAL STUDIES S.A. ENGINEERING COMPANY and auditing Cra 7 No. 60A - 51 Bogota DC Phone: (1) 3100811 POSITION: PROJECT CONTROLLER PROCESS MECHANICS - V9 / Q5 Location: PACIFIC RUBIALES CPF Field Goal Campo Caño Limón / Campo Caricare Arauca Period: From October 2007 to September 8, 2008 FUNCTIONS * Technical, administrative and financial in the proposed expansion of the production facility for internal auditing Caricare OXY * Electromechanical Assembly to treat a Battery Fluid KBD 50,000 from wells in the location , installation and assembly of three ( 3) heat treaters , five (5) heat exchangers, three ( 3) boilers for steam generation one (1 ) scrubber for gas evacuation , following the rules laid API , ASTM, and releasing the welds by means of methods of non -destructive testing, liquid penetrant , radiography, assembling a network system against provisional and final fire , construction three (3 ) , production tanks 3000.15000 capabilities and 25000 barrels . * Change Order Creation for conducting field work * Mechanical and Electromechanical erection of rotary and static equipment , Gum Barrels , 10,000 barrels of crude recovery capacity , quality control in prefabrication and assembly of the internal parts of Gum Barrels , Heated treaters , separators in field production
01.06.2007 — 31.07.2007
PROASEM LTDA
PROJECT ENGINEER
PROASEM LTDA CONSULTING AND ENGINEERING COMPANY Cra47 A No 118-36 BOGOTA DC - COLOMBIA PHONE : (091) 6377876 POSITION : PROJECT ENGINEER Period: June-July 2007 FUNCTIONS * Data Collection Process for the preparation of technical documentation on the project of Basic and Detailed Engineering of Dynamic Systems Measurement of Crude measuring stations of the Superintendent of Operations Ecopetrol SA in Apiay . * Preparation of Isometrics - Plot Plan of measuring stations * Completing the list deTieins , Design criteria and process description , etc. .
27.03.2007 — 17.05.2007
TWM TOTAL WASTE MANAGEMENT MASA - MECHANICAL ASSOCIATES
PLANT OPERATIONS CONSULTANT
TWM TOTAL WASTE MANAGEMENT MASA - MECHANICAL ASSOCIATES COMPANY SOLID WASTE TREATMENT KM 11 VIA GUACIRCO Neiva - Huila - COLOMBIA PHONE : (098) 8716018 POSITION : PLANT OPERATIONS CONSULTANT Period : 27 March 2007 until 17 May 2007 FUNCTIONS * Perform the classification of transactions and inventory the various teams that make up the plant to place them the Tag ID . * Perform different operating procedures for pre - start , start-up and stabilization of thermal desorption units , unit Sludge Treatment , Water Treatment unit , solids treatment unit . * Give technical support for the implementation of ISO 14001, Environmental management focused , advise operations to increase efficiency in plant productivity Thermal desorption .
07.10.2006 — Now
ELINTE SA ESP CLEAN NOW AND SPECIAL INTEGRAL TECHNOLOGIES
HEAD OF PRODUCTION PLANT
Phone - Ground 4240364 4818602 ô Title: HEAD OF PRODUCTION PLANT Period: October 7, 2006 By February 2007 FUNCTIONS * Manage, monitor and control operations in industrial waste incineration plant productivity by ensuring a safe and efficient way of meeting the goals established productivity. * Management and control of operating costs * Coordination of Industrial Waste Collection of different Clients * Coordination and HSE program implementation and support in the implementation of the ISO 18001 standard focused on Industrial Safety and Occupational Health.
03.06.2003 — 07.08.2006
COLOMBIAN FERTILIZERS SA - ABOCOL
PRODUCTION ENGINEER
COLOMBIAN FERTILIZERS SA - ABOCOL - PETROCHEMICAL COMPANY AND FERTILIZERS Km 11 Vía Mamonal Cartagena - Bolívar Phone - 095 Plant - 6685000-6688300 Title: PRODUCTION ENGINEER Period: June 3, 2003 to August 7, 2006 FUNCTIONS * Manage, monitor and control operations in the complex NPK fertilizer production ensuring a safe and efficient manner in compliance with established production goals and quality. * Monitor and manage staff of operators, contractors arranged in production operations in different areas of the plant , utilities , finished product warehouse , storage of raw materials, washers areas , Hoppers, Granulator , Panel builders reactors . * Runs service requests for maintenance shutdowns and meet the different mechanical, electrical and electronic equipment failures that arise in the production process, ensuring the availability and reliability of equipment to produce under optimal conditions. * Propose and undertake continuous improvement on the ground. * Run programs HSE, safety, health and environment of the plant , meeting the requirements of ISO 9001 , ISO 14001 and OHSAS 18001 * Creation and implementation of the various procedures and operational instructions for starting and stopping the plant.
01.02.2003 — 31.05.2003
PAN AMERICAN CHEMICAL - PQP - CHEMICALS COMPANY
PLANT MANAGER
PAN AMERICAN CHEMICAL - PQP - CHEMICALS COMPANY Muna Industrial Zone Phone - 7198732 Floor Title: PLANT MANAGER Period : February 2003 to May 2003 FUNCTIONS * Manage, monitor and control operations and factory production of sulfuric acid, Oleum , Sodium Bisulfite , Ferrous Sulfate Mono hydrate , Heptahydrate , Micronized Sulfur in a safe and efficient manner meeting the goals established production , control and management of Quality Laboratory products , production program management Jade Edward, Control and Management of inventories of finished goods and Commodities .
01.11.2000 — 30.06.2002
OILFIELD EQUIPMENT SERVICES LTD
OILFIELD EQUIPMENT SERVICES LTD OPERATION AND MAINTENANCE COMPANY MECHANICAL GAS / OIL . BP (British Petroleum) 11th career No. 93-67 Bogotá DC Telephone Plant Cusiana 098 -6346363 / 6346490 Tauramena , Casanare Title: INGENIERODE OPERATION and PRODUCTION Period: November 2000 to June 2002 FUNCTIONS * Process Engineer and operation of a water injection plant , crude separation and pumping , responsible for coordinating the pre - start , start-up and stabilization , including control of the operation and maintenance of the plant. Optimization for plant startup in cold and hot , managing the different needs of spare parts for different team that made the plant, ejector vacuum pump high pressure hydrociclones , tanks , agitators , blowers , pneumatic valves , electric valves , manual valves , water pipelines at high pressure vacuum pumps , mud pumps , high pressure pumps and WEIR IDP to monitor and detect different corrosion problems in equipment, piping and plant. Participation with the group integrity of tank inspections in confined space and making recommendations to the terms of reference for the application of interior painting of tanks, as well as the participation. Review of cathodic protection programs of the different lines and systems of plant water reinjection Phase II. In addition I count with extensive knowledge of operating procedures and systems of work permit as well as the application of the rules of HSE ( Hygiene , security and environmental ) . I have a certificate of competence in HSE operations Cusiana , Coordination boot Treatment Plant Water and Gas. * Coordinate and control the operation and process of the various equipment and systems installed plan for effective treatment of fluids from oil wells and meet production goals and safety requirements. * Coordinate the various works executed plan to achieve within the time determined the requirements of the company. * Inspections Tank integrity, fire systems, degassing tower . * Ensure that the activities of production and realization of different maintenance are developed under the strict rules of industrial safety and the procedures and policies established by the company are met. * Managing human resources under my charge, by directing it towards the goals set by the company. * Coordination of Work Safe , and conducting risk analysis and assessment for the different activities . * Complete Management System Work Permit. * Full management policies HSE (Hygiene , Health Safety and Environment ) * Knowledge of Treatment and Chemical Analysis Crude, Gas and Water Produced water injection.
01.10.1994 — 31.08.2000
CENTRAL TERMOELECTRICA CARTAGENA; TERMOCARTAGENA S.A. E.S.P
Engineer Area of Operation and Environmental Chemistry
CENTRAL TERMOELECTRICA CARTAGENA POWER GENERATION COMPANY TERMOCARTAGENA S.A. E.S.P Km 4 TrackMamonal , Tel 6685051 Cartagena de Indias, Bolivar Title: Engineer Area of Operation and Environmental Chemistry Period: October 1994 to August 2000 FUNCTIONS * Reply by the process and operation of boilers and water quality of the water treatment plants , physicochemical analysis and implementation of the Chemical treatment of water used for feeding high pressure boilers for steam generation & energy cooling towers . * Determining causes of problems in plants. * Completing the consumption rate control and inventory of chemical products for three ( 3) different cooling systems at the plant. * Command and Control a group of four ( 4) Chemical Laboratory analysts and six (6 ) Chemical Control operators condensate cycle - steam for three ( 3) High-pressure boilers . * Ensure the implementation of the Environmental Control Programs to meet the terms required by Colombian law * Inspections Condensers, Boilers , Compressors, Cooling Tower , Tower Including Vacuum Hydro test, Tanks , Pipe, Valves , Networking Against fire, efficiency analysis , etc. . * Ensure compliance with the Standards of Occupational Health and Safety in handling Chemical products according to the requirements requested by the OHSAS 18001 standard , implementation and follow-up required by requsitos ISO 9000 quality standards . * Coordination of work for changes resins , activated carbon , sand in water plants . * Determination of stock and Chemical Reagents used in plant and Chemical Laboratory , including the management of Regenerating Hydrochloric acid and sodium hydroxide . * Coordination and organization of the activities of the Chemical Laboratory , sampling Natural Gas.
01.01.1994 — 30.09.1994
ASFALTOS NORTH SA
Operations Engineer
ASFALTOS NORTH SA ASPHALT PRODUCTION COMPANY RUSTY OIL DERIVATIVE Plant Road Salgar , Barranquilla Title: Operations Engineer Period: January 1994 to September 1994 FUNCTIONS Responsible in the area of ??process operating a production plant oxidized asphalt and its derivatives , taking the operation of a boiler and packaging and shipping the product, review the analysis control Quality in the Production of Oxidized Asphalt and Derivatives for product release , coordinating the work to be performed in Plants and marketing products.
01.01.1990 — 31.12.1993
CORELCA. ELECTRIC CORPORATION ATLANTIC COAST.; ZEITLICHE UND RÄUMLICHE VERFÜGBARKEIT
Assistant Environmental Engineer Party
CORELCA. ELECTRIC CORPORATION ATLANTIC COAST. URRA I Hydroelectric Project Office Executive Center II. Kra 55 # 72 - 109.Tel. 3560200. Barranquilla Position: Assistant Environmental Engineer Party Period: January 1990 to December 1993 FUNCTIONS * Development of Terms of Reference for hiring conducting Environmental Studies in Thermal and hydroelectric projects. * Technical Support on Water Quality Studies and results analysis in the Urra hydroelectric project I. * Participation in the preparation of technical reports related to planning , coordination of environmental activities CORELCA generation plants . * Nationwide Participation in meetings of the Colombian electricity sector Environmental Committee - CASEC - ZEITLICHE UND RÄUMLICHE VERFÜGBARKEIT YES, I have flexibility Location anywhere in the world. SONSTIGE ANGABEN

Attachments